Dundee Precious Metals Announces Update to Operations at Tsumeb

September 5, 2019

TORONTO, Sept. 05, 2019 (GLOBE NEWSWIRE) -- Dundee Precious Metals Inc. (TSX: DPM)(“DPM” or “the Company”) announces that on September 3, DPM had an incident at its Tsumeb smelter following a pressurization event in the Ausmelt offgas system during a restart after routine maintenance activities. Regrettably, injuries were sustained by two employees, both of whom are receiving appropriate care. 

“The safety of our employees continues to be our highest priority,” stated Rick Howes, President and CEO. “We are committed to supporting the individuals that have been injured to achieve a fast and full recovery.  A full investigation into the cause of this incident is underway to ensure we prevent such incidents in the future.”

The Company has initiated the required repairs to the offgas system which are expected to take 10 to 14 days, during which the Ausmelt system will not be in operation. With this estimated additional downtime, the smelter is still trending towards the low end of its 2019 guidance of between 225,000 and 250,000 tonnes of complex concentrate smelted. The planned maintenance shutdown for the fourth quarter of 2019 will occur as originally scheduled. Following recent operational improvements, the next Ausmelt shutdown is not expected until 2021 allowing for additional smelter throughput in 2020. 

About Dundee Precious Metals

Dundee Precious Metals Inc. is a Canadian based, international gold mining company engaged in the acquisition of mineral properties, exploration, development, mining and processing of precious metals. The Company's operating assets include the Chelopech operation, which produces a gold-copper concentrate containing gold, copper and silver and a pyrite concentrate containing gold, located east of Sofia, Bulgaria; the Ada Tepe operation, which produces a gold concentrate containing gold and silver, located in southern Bulgaria; and the Tsumeb smelter, a complex copper concentrate processing facility located in Namibia. DPM also holds interests in a number of developing gold and exploration properties located in Canada and Serbia, and its 10.3% interest in Sabina Gold & Silver Corp.

Cautionary Note Regarding Forward Looking Statements

Certain statements and other information included in this press release and our other disclosure documents constitute “forward looking statements” or “forward looking information” within the meaning of applicable securities legislation, which we refer to collectively hereinafter as “Forward Looking Statements”. Forward Looking Statements are statements that are not historical facts and are generally,  but not always, identified by the use of forward looking terminology such as “plans”, “expects”, or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “outlook”, “intends”, “anticipates”, or “does not anticipate”, or “believes”, or variations of such words and phrases or that state that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. The Forward looking statements in this press release relate to, among other things the timing and expected duration of maintenance shutdowns and the future operating and financial performance at the Tsumeb smelter. Forward Looking Statements are based on certain key assumptions and the opinions and estimates of management and Qualified Persons (in the case of technical and scientific information), as of the date such statements are made, and they involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any other future results, performance or achievements expressed or implied by the Forward Looking Statements. In addition to factors already discussed in this document, such factors include, among others: conclusions of economic evaluations and economic studies; changes in project parameters as plans continue to be refined; possible variations in ore grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; uncertainties and risks inherent to developing and commissioning new mines into production, such as Ada Tepe, which may be subject to unforeseen delays, costs or other issues; uncertainties inherent with conducting business in foreign jurisdictions where corruption, civil unrest, political instability and uncertainties with the rule of law may impact the Company’s activities; social and non-governmental organizations (“NGO”) opposition to mining projects; fluctuations in metal and acid prices, toll rates and foreign exchange rates; unanticipated title disputes; claims or litigation; limitation on insurance coverage; cyber-attacks; differences in U.S. and Canadian practices for reporting Mineral Reserves and Mineral Resources; lack of suitable infrastructure or damage to existing infrastructure; delays in obtaining or failure to obtain government permits, or non-compliance with permits; as well as those risk factors discussed or referred to in any other documents  (including without limitation the Company’s most recent Annual Information Form) filed from time to time with the securities regulatory authorities in all provinces and territories of Canada and available on SEDAR at www.sedar.com. The reader has been cautioned that the foregoing list is not exhaustive of all factors which may have been used. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in Forward Looking Statements, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended.  There can be no assurance that Forward Looking Statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The Company’s Forward Looking Statements reflect current expectations regarding future events and speak only as of the date hereof. Unless required by securities laws, the Company undertakes no obligation to update Forward Looking Statements if circumstances or management’s estimates or opinions should change. Accordingly, readers are cautioned not to place undue reliance on Forward Looking Statements.

For further information, please contact:

DUNDEE PRECIOUS METALS INC.

Rick Howes
President and
Chief Executive Officer
Tel: (416) 365-2836

Michael Dorfman
Executive Vice President, Corporate Development
Tel: (416) 365-5090

Janet Reid
Manager, Investor Relations
Tel: (416) 365-2549
Subscripción a actualizaciones por email
Arrow LogoREGISTRARSE