Chelopech Mine, Bulgaria

High-Quality Cornerstone Asset and
Center of Mining Innovation

Ownership 100%
Type Underground copper-gold mine
Mine Life 2032
Proven & Probable Mineral Reserve Estimates 1.6 million gold ounces 
305 million pounds of copper
2023 Production 161,872
2024 Production Guidance 155,000 - 175,000 ounces of gold
29 to 34 million pounds of copper
2024 guidance for All-In Sustaining Cost $650 - $790 per ounce of gold sold

Subscribe to email updates
Arrow LogoSign Up
 image

Chelopech is an underground copper-gold mine located in Bulgaria, approximately 75 kilometres east of the capital city of Sofia. Since acquiring the operation in 2003, DPM has transformed Chelopech into a world-class operation with leading operational and environmental performance.

Underground mining method consists of using sub-level long-hole open stoping with paste fill. Ore is crushed underground and transported to the surface using conveyors. Chelopech produces copper-gold and pyrite-gold concentrates that are shipped to global smelters for processing.

Optimizing Performance and Reducing Costs image

Optimizing Performance and Reducing Costs

A multi-year capital investment program transformed Chelopech into a high quality, modern operation with strong production and low costs. Chelopech today has a solid track record of meeting or exceeding international standards for worker safety, environmental protection and sustainable development. 

Chelopech is a leader in digital innovation, achieving significant improvements in efficiency, environmental performance and worker safety. The mine has 100% reliable underground Wi-Fi coverage at 600 metres below ground level, and, in 2019, commissioned the industry’s first deep-learning autonomous drone working in an underground environment. 

Track Record of Extending Mine Life image

Track Record of Extending Mine Life

Chelopech’s long mine life extends to 2032, based on current mineral reserve estimates, with a strong mineral resource base.

There is strong potential to continue extending the mine’s life, with our demonstrated track record of converting mineral resources into mineral reserves, and our in-mine and growing brownfield exploration programs.

Sustainability Highlights

icon image

One of the lowest greenhouse gas emissions intensity rates among gold mines globally

icon image

Zero discharge of industrial wastewater for the past two years

icon image

Named largest corporate donor in Bulgaria for six years in a row

icon image

Nearby municipality has the highest average salaries in Bulgaria

icon image

70% reduction in fresh water used per tonne of ore processed

icon image

Nearly 60 tonne reduction in annual dust emissions 

Technical Reports and Public Disclosure Documents

For more information on upcoming or ongoing projects or initiatives at Chelopech: 

Jul 25
Information Preventive measures for safety and emergency readiness
pdf icon
Feb 03
Notification Investment Project Chelopech-North
pdf icon
Mar 31
NI 43-101 Technical Report - Mineral Resource and Mineral Reserve Update for the Chelopech Mine, Bulgaria
pdf icon